Expert Equipment Integration by Experienced Professionals

Direct delivery from the manufacturing plant to cell site.

  • Solves logistical challenges:
    • Eliminates double handling of shelters.
    • Reduces or eliminates the need for and excess cost of warehouse space.
  • Increased speed of deployment for faster project completion.

Equipment expertise:

  • Installation by highly skilled and trained technicians: 
    • Communications equipment: Motorola, Ericsson, Siemens, Nokia, Nortel, Thales Transmitter and Lucent.
    • Power systems: Deka, North Starr, Delta, Emerson, Lucent, GNB, Peco II and C&D.
    • FIF frames and DSX panels.
  • Capacity to handle large-scale equipment deployments.
  • Inventory and warehousing personnel receive, barcode and stage equipment to meet 100 percent of Sarbox requirements.
  • Secure facilities:
    • Limited and secure site access.
    • 24-hour security surveillance.
    • Criminal background checks on all employees.
    • Documented security procedures.
  • Use wiring schematic and floor plan for placement of equipment.
  • Use scope of work to establish Fibrebond parameters for integrating equipment into the shelter.
    • Label and wire all equipment according to specifications.
    • Install and terminate all wires and cables.
    • Verify accuracy of all equipment installed upon shipment.

 

Current Project

Helping Our Customers Meet Build-Out Challenges
During the fall of 2007, one of Fibrebond’s largest customers needed 125 equipment shelters to expand coverage in four different market areas. The contract was coordinated through the national corporate office, with input from all of the affected regions. Each of the 11’6” x 20’ shelters was engineered to customer specifications using eight standard building designs and 20 non-standard designs, all with two-hour fire ratings. By maximizing its manufacturing efficiencies, Fibrebond was able to manufacture the 125 shelters in less than 90 days, in addition to 63 shelters that were previously constructed and awaiting site assignments, for a total of 186 shelters shipped. Fibrebond met the challenges of time, engineering and multi-state code compliance and delivered the project on time.