Fibrebond
Heading

Expert Maintenance on Any Shelter, Anywhere

Maintain and improve your investment to prevent downtime.

  • Fibrebond repairs and maintains all types of shelters, regardless of manufacturer.
  • Work is completed on the cell site without interrupting service.
  • Long-term relationships with OEM vendors is leveraged into quick responses on any warranty issues.
  • Multiple skilled teams for deployment anywhere in the country.
  • Satisfaction is guaranteed by a three-year warranty on all field services and a 10-year warranty on new roofing.

Leading the way in lowering operating costs and protecting the environment.

  • HVAC Upgrades:
    • Protect your valuable equipment.
    • Are more energy efficient and lower operating costs.
    • Are compliant with the R-22 phase out law.
    • Demonstrate a commitment to the environment.
  • On-going maintenance can save money by preventing damage to equipment:
    • One-day and double-wide exterior maintenance.
    • Roof repair and replacement.
    • Floor repair and replacement.
    • Door and hardware replacements.

Field Services Fact Sheet

HVAC Green Upgrades

Field Services capabilities include:
  • One-day exterior maintenance
  • Roof repair and replacement
  • Floor repair and replacement
  • HVAC upgrades
  • Door and hardware replacements
  • Drain extensions and rain shields
  • Shelter offload and set up
  • Generator retrofits


Current Project

Helping Our Customers Meet Build-Out Challenges
During the fall of 2007, one of Fibrebond’s largest customers needed 125 equipment shelters to expand coverage in four different market areas. The contract was coordinated through the national corporate office, with input from all of the affected regions. Each of the 11’6” x 20’ shelters was engineered to customer specifications using eight standard building designs and 20 non-standard designs, all with two-hour fire ratings. By maximizing its manufacturing efficiencies, Fibrebond was able to manufacture the 125 shelters in less than 90 days, in addition to 63 shelters that were previously constructed and awaiting site assignments, for a total of 186 shelters shipped. Fibrebond met the challenges of time, engineering and multi-state code compliance and delivered the project on time.