Project Experience

Gretna, Mississippi


When one car accident resulted in major damage to a customer's cell site, Fibrebond personnel inspected the site within 24 hours and engineers designed two retrofit walls that were replaced in less than one day without taking the site off service.
 

Before
Equipment Shelters
 
During
Equipment Shelters
 
After
Equipment Shelters
 

Charles City, Iowa


A one car accident resulted in damage to the wall which supported the HVAC units. Fibrebond personnel removed the units, performed a complete wall replacement and re-installed the original HVAC units in two days with no cellular service interruption.

Flora, Alabama


After acquiring the sites of another carrier, a Fibrebond customer found a site that was completely overgrown with vines and weeds, making it nearly impossible to reach. Fibrebond personnel cleared the site and completely refurbished the shelter in one day.
 

Equipment Shelters Equipment Shelters

 

176 Shelter Installations


In 2004, Fibrebond was challenged to complete equipment installations for a major wireless carrier on 176 shelters including power bays, batteries, relay racks and bays using either Ericsson or Seimens products. Teams worked seven days a week installing seven (7) different equipment configurations to complete the project on time.

200 Shelter Installations


Since January of 2006, Fibrebond has completed equipment installations on more than 200 shelters for one of the nation's largest wireless carriers, with 68 of those delivered over a 90-day period. Work included installation of power bays, battery racks, relay racks, Lucent, Nortel and Motorola racking. This is an ongoing project as Fibrebond continues to meet the needs of this national wireless carrier.

186 Shelters Shipped in 90 Days


During the fall of 2003, one of Fibrebond's largest customers needed 123 equipment shelters to expand coverage in four different market areas. Each shelter was engineered to customer specifications using eight standard building designs and 20 non-standard designs, all with two-hour fire ratings. By maximizing manufacturing efficiency, Fibrebond shipped the 123 shelters, in addition to 63 shelters that were a waiting site assignments, for a total of 186 shelters in 90 days. Fibrebond delivered the project on time despite the challenges of time, engineering and multi-state code compliance.

1,300 Shelter Orders


In 2004-05, one of the nation's largest cellular carriers requested nearly 1,300 shelters for as part of an ongoing national contract. Because of scheduling conflicts, 80 of these shelters had to be delivered in 12 days. Fibrebond met the challenges of the customer’s detailed specifications for both construction and equipment installation to deliver every order on time.