Author: Fibrebond WebAdmin

The United States is currently poised for massive energy infrastructure development, in part due to the EPA Clean Power Plan which will lead to greater penetration of renewable energy sources. The International Energy Agency estimated in 2015 that costs associated with infrastructure changes and grid technologies will reach $2.1 trillion by 2035. NERC stated that roughly 7,000 miles of new transmission lines will need to be added to the US...

Are you one of the millions who have invested in expensive outdoor power and/or utility equipment? Did you know that you may actually be running the risk of your equipment being damaged by weather conditions? It’s a frightening prospect, and one we are sure you want to avoid. If you have an interest in protecting your investment at minimum cost, take a moment to explore the best solution to this...

Steel and concrete composite and hybrid buildings were first constructed in Japan for low-rise buildings in low seismic regions. The success of these structures was noticed by engineers in the U.S., spurring the creation of a U.S.-Japan cooperative structural research project on composite and hybrid structures. The goal of this cooperative was to develop steel and concrete moment-resisting frame systems suitable for medium- and high-rise buildings in moderate to high...

Request a Proposal